Skip to content

Apps built properly the first time.

Power Apps, Power Automate, Dataverse and Power Pages, shipped to production with environments, DLP and an owner.

Duration
Build Sprint: 4-6 weeks for one use case. Delivery retainer: ongoing.

Plenty of business processes still run on Excel files, shared mailboxes and approvals by email. Microsoft Power Platform can replace them quickly, but an app built in a rush in the default environment becomes next year's support problem. We build apps and automations that are meant to live in production: a clear data model in Dataverse, solutions with source control, separate environments, and documentation your team can use.

Who it’s for

  • Business unit heads and operations directors

    A process runs on Excel, email or paper and keeps breaking.

  • IT teams with a backlog of internal tool requests

    You want delivery capacity that already follows your governance rules.

  • Organisations with a prototype built by a colleague

    The app works, it is now business-critical, and nobody wants to touch it.

What we do

  • Canvas and model-driven Power Apps
  • Power Automate flows for Microsoft-stack processes and approvals
  • Dataverse data modelling, security roles and business rules
  • Power Pages portals for customers, partners and suppliers
  • Solution-based ALM with Pipelines in Power Platform and source control
  • Integration with Microsoft 365, SharePoint, Dynamics 365 and Power BI

What you get

  • A working app or automation in a governed production environment
  • Solutions in source control, with a repeatable deployment path
  • Technical documentation and a user guide, in Bulgarian or English
  • A handover session and a named owner on your side

How it works

  1. 1

    Frame

    We pick one use case, agree who owns it and what success looks like, and decide which environment it belongs in.

  2. 2

    Build

    We build in short cycles with the people who will use it, and demonstrate working software every week.

  3. 3

    Release

    We deploy through a pipeline to production, train the first users and check that DLP and security roles behave as designed.

  4. 4

    Hand over

    Your team gets documentation and a walkthrough. We stay on call, or move into managed support if you want it.

What we don’t do

We do not build outside the Microsoft stack, and we do not ship an app without an owner, a production environment and DLP in place.

Certifications behind the work

  • AB-400
  • AB-410

Questions we get

How long does it take to build a Power App?

A focused business app usually takes 4-6 weeks from first workshop to production, as a fixed-scope Build Sprint. Larger solutions are split into releases so you see value earlier.

Power Apps or SharePoint lists: which should we use?

For simple lists and forms with a few users, SharePoint is often enough. When you need relationships between tables, row-level security, approvals or offline use, Dataverse and Power Apps are the better base. We recommend the lighter option when it is enough.

Can you replace an Excel process with an app?

Yes, this is one of the most common projects. We model the data properly in Dataverse or SQL-backed sources, keep the familiar reports, and migrate the history so nothing is lost.

Do you take over apps built by someone else?

Yes. We start with a short review of the app, its connectors and its data. Then we agree what to fix, what to rebuild and what to leave alone. This is often the right first step before extending an app.

Do you work in Bulgarian?

Yes. Workshops, user guides and documentation can be in Bulgarian or English. Interfaces can be built for both languages when your users need it.

Have a Microsoft project in mind?

Tell us what you need built, fixed or supported. A senior consultant replies within one business day.